Rehabilitation of Road ІІІ-3004, Trastenik - Orehovitsa - Road ІІІ-137 (length 16.340 km)
Project implementation period: September 2012 – September 2013
Employer: Road Infrastructure Agency
PATSTROY-92 AD is a lead partner in Trastenik 2012 Consortium. The consortium is the contractor of the project Rehabilitation of Road III-3004 Trastenik – Orehovitsa – Road III-137 from km 13+648 to km 29+987.
The project is financed by the EU Structural Funds and is implemented under Romania –Bulgaria Cross-Border Cooperation Programme 2007-2013, co-funded by the European Regional Development Fund and the state budget.
The completed road reconstruction aims to restore and improve the road traffic conditions and strengthen the bearing capacity of the road pavement in order to increase traffic safety and provide optimal road drainage in the said section.
General overhaul of 14 small and 3 big bridge structures has been performed: a 10.5 m long bridge in the town of Trastenik, an 8 m long bridge in the village of Orehovitsa and a bridge over the River Iskar with a total length of 66 m.