Struma Motorway, LOT 1, Dolna Dikanya – Dupnitsa Road Section along the transport axis Vidin - Sofia - Kulata (length 16.780 km)
Project implementation period: 01.10.2011 - 23.07.2013
Employer: Road Infrastructure Agency
Struma-1 Consortium comprising PATSTROY-92 AD, GBS Infrastructure Construction AD and the Italian company Impresa S.p.A. is the contractor to do the construction and assembly works on Lot 1 of Struma Motorway, Dolna Dikanya – Dupnitsa Road Section.
The project is implemented under the Operational Programme Transport 2007-2013, Priority axis II - Development of road infrastructure along the major national and Pan-European transport axes.
The works executed by PATSTROY-92 on Lot 1 include the complete construction of “Dolna Dikanya” and “Dupnitsa North” road junctions, major and auxiliary road transport facilities, road infrastructure utility networks and retaining walls, water-pressure pipelines, irrigation and drainage facilities.
Total length of the motorway section: 16.780 km
Motorway width: A-29 m