October 2019

Patstroy-92 AD is a member of GEOPAT LOT 1 Consortium, with leader Geostroy AD, which is the contractor to execute additional design and construction of Road I-1 (E-79) Mezdra – Botevgrad, Lot 1 from km 174+800 to km 194+122. The road will have two lanes in each direction with a gauge of 20 m.

 The traffic volume in the region has been strongly affected by the opening of Danube Bridge 2 in 2013. Vidin – Botevgrad expressway (167 кm) is a priority project under the investment programme of the Road Infrastructure Agency and the Ministry of Regional Development and Public Works until 2022. The overall modernization of the road from Danube Bridge 2 to Kulata border checkpoint will secure a high quality connection between motorways in North-West Bulgaria.

Operational Programmes

   

Този сайт използва бисквитки, ако продължите да използвате сайта ни вие се съгласявате с нашата политика за бисквитките.