News

21 August 2013

PATSTROY-92 AD in a consortium with Geostroy AD and Mostremont-97 OOD has started the implementation of emergency repair and rehabilitation works to the viaduct at km 61+327 on Trakia Motorway.

31 July 2013

On 31 July 2013, the first sod was turned on Lot 2 of Struma Motorway. Lot 2 is a 37.5 km long section connecting the towns of Dupnitsa and Blagoevgrad. The ground-breaking ceremony was attended by the Minister of Regional Development Desislava Terzieva, the Deputy Minister of Transport, Information Technology and Communications Petar Kirov and the Chairman of the Management Board of Road Infrastructure Agency M.Eng. Lazar Lazarov. The Contractor of the road section is Struma-Lot 2 Consortium (comprising the Bulgarian companies PATSTROY-92 AD, GBS-Infrastructure Construction AD and the Italian company Impresa S.p.A.).

23 July 2013

On 23 July 2013, the first completed 13.98 km section of Lot 1 of Struma Motorway was officially opened for traffic in the presence of the Minister of Regional Development Desislava Terzieva. The contractor of construction and assembly works is Struma-1 Consortium comprising the Bulgarian companies PATSTROY-92 AD, GBS-Infrastructure Construction AD and the Italian company Impresa S.p.A. The project is co-financed by the EU Cohesion Fund and the state budget under the Operational Programme Transport 2007-2013.

30 May 2013

Construction and assembly works have commenced on the project Botevgrad – an attractive destination for cultural-historical, ecological and sports-entertainment tourism, Lot 3: Repair and restoration of a road connecting Bozhenitsa village - Urvich meadow.

7 May 2013

A consortium with Lead Partner PATSTROY-92 AD started the execution of construction and assembly works on the project Correction of the Yablanitsa River in the town of Etropole from pivot point 435-418 to pivot point 520-521.